Client: | Wirral BC |
---|---|
Partnership: | DavyMarkham |
Location: | Birkenhead, The Wirral, Liverpool |
Hunger Hydraulic designed, manufactured and supplied 2 large cylinders to operate the bridge.
Each cylinder is 500mm bore x 300mm rod dia x 9,360mm stroke mounted via stainless steel self aligning bearings each end.
Hunger supply also included a hydraulic control valve manifold mounted underneath each cylinder.
Hunger UK provided project management throughout, liasing closely with DavyMarkham and Dawnus Construction from the enquiry stage through to commissioning and handover.