Leamouth Lifting Bridge
Client: John Sisk & Son
Location: London City Island
Hunger Hydraulic designed, manufactured and supplied 4 large cylinders to operate the bridge.
Each cylinder is 2 stage telescopic cylinder with a total stroke of 4,250mm.
Rod ends are equipped with ball joints for connection/interaction with the bridge deck.
Hunger UK provided project management throughout, liaising closely with the client and site engineers.